NetRisk Features

NetRisk™, manage project risk with confidence

Plan, schedule, and perform risk analysis all in one seamless and intuitive application.

application windows showing 3 different views of the NetRisk manager

NetRisk™ is a supplementary module for NetPoint® that allows you to perform qualitative and quantitative risk analysis.

Contact us for a demo

Learn more about schedule risk analysis

Key NetRisk Features

showing the detail of a schedule network fragment

The NetRisk Manager

Do everything in one unified location.

Build the risk register, range activity durations, run simulations, and analyze results all in a single streamlined window – working dynamically with the schedule instead of obscuring it.


Duration Ranging, Floating, & Pacing

Model activity-based risk events to better reflect real-world conditions.

Capture the uncertainty in activity durations and simulate deferred start dates for activities when prescribed float conditions are met.

Floating & Pacing

FloatingEvent that occurs randomly and that involves delaying the start of an eligible activity within its float then-existing when the activity is scheduled.

Pacing

Event that occurs randomly and that involves delaying the start of an eligible activity within its float then-existing when the activity is scheduled, provided the ratio of then-existing float to deterministic float exceeds a specified threshold.

For more on floating and pacing, please read Mitigating the Planning Fallacy

showing the detail of a schedule network fragment

showing the detail of a schedule network fragment

Global Duration Ranging

Save time entering data and approximate risk in seconds.

Choose a global distribution shape and corresponding duration range to apply to every activity, run a simulation, and assess approximate schedule risk in a matter of seconds.


Prime Risks

Unique risk-activity impact parameters means never duplicating risk events again.

Create and define risk events that can impact different activities with unique degrees of impact and probabilities of occurrence for each risk-activity relationship.

showing the detail of a schedule network fragment

showing the detail of a schedule network fragment

Statistical Power

Easy to use, yet fully-featured.

Correlate activity durations and risk likelihoods and impacts, choose from nearly a dozen probability distributions, and run simulations using Monte Carlo or Latin Hypercube sampling methods.


Interactive Results Analysis

Sophisticated tools for analysis and reporting.

View, customize, and export a variety of charts that compare pre-treatment and post-treatment scenarios, and view the schedule at desired p-values directly on the canvas.