NetPoint

Planning and scheduling together.

Free Trial

Plan and schedule collaboratively with a uniquely visual interface in one seamless process.

Engage the whole project management team! NetPoint® transforms scheduling into an interactive, planning-centric experience that ensures communication and team collaboration.

With NetPoint’s intuitive representation of activities and relationships, all stakeholders can come together in a seamless process that produces a CPM/GPM® logic-driven schedule from the same tool used for planning.

New Features in Version 5.3

The latest version of NetPoint includes much requested features such as a resizable timescale, savable filters, and the ability to add headers and footers.

Breakthrough innovations in project scheduling software

 

NetPoint combines the power of the GPM algorithm with a highly visual, user-friendly interface.  The result is a uniquely flexible project management software.   Empower your team members and project managers to plan forward and backward, build schedules faster, and communicate the project timeline more clearly than ever.

Planned Dates

Build a schedule that better reflects real-world conditions by placing activities anywhere within their total float range, without constraining float.

Forensic Float

Since GPM® doesn’t rely on early & late dates for network calculations, float values are preserved left of the data date – particularly useful in retrospective schedule analysis

And More

 

  • Toggle date modes (early, planned, late)
  • Real-time schedule calculations
  • Self-healing network logic
  • As-built critical path

Superior graphical interface

 

The flexibility of NetPoint’s graphical interface makes project planning far more natural and intuitive for project managers and team members. The results are project schedules that can be understood by stakeholders and the whole project team.

 

  • Draw and link activities right on the canvas
  • Position multiple activities on the same line
  • Group activities by WBX, by work area, or by business unit
  • Customize geometries to clearly represent important network paths

Global Edit Mode

A fast method for optimizing schedule appearance. GEM™ activates all data elements on the canvas for simultaneous positioning and formatting.

PolyTime®

Choose the time-unit best suited to your project, from minutes up to years. Great for depicting the appropriate timescale on a summary schedule, or for micro-planning time-sensitive turnarounds.

And More

 

  • Multiple activities per line
  • Object styles
  • Real-time canvas interaction

Dynamic & responsive project planning

 

Gone are the days of pressing F9 and waiting for the schedule to calculate and update. With GPM’s real-time and self-healing rules, dates, durations, logic relationships, and the critical path all refresh in real-time, as the schedule is modified. It’s never been easier for project managers to anticipate critical activities, highlight the critical path for everyone to see, and evaluate alternative planning or resource management scenarios on the fly.

Backward Planning

Since activities can be drawn and stretched in either direction, late-dates mode allows projects to be more naturally planned backward from the project end date.

Visual Resource Modeling

By plotting histogram graphs and curves directly underneath activities, resource-leveling becomes a truly interactive and engaging exercise.

And More

 

  • Dynamic critical path analysis
  • Multiple calendars
  • Custom non-work days
  • Weather modeling

Robust tools for schedule maintenance

 

Update and maintain the schedule during project execution and produce reports and timelines that convey up-to-date project status to key stakeholders, all right from NetPoint®. The visual interface makes it easy to review the schedule network and make necessary adjustments so that a record of the actual work sequence – and even the critical path – can be retained.

Schedule Updating

Insert a data-date and receive immediate visual feedback on the activities falling behind schedule. Watch the notification counter decrease as activities are actualized or updated to reflect changes in work.

Target Comparisons

Establish a baseline schedule, commit project updates, and compare variances between dates, durations, and float values. Export to Excel for more flexible analysis.

And More

 

  • Constraint flags
  • Activity filters
  • Activity codes
  • Search within a schedule

All of the basics you expect

All of the standard bells and whistles you’ve come to expect in an industry-leading project management tool.

Up to 2,500 activities

Unlimited undo/redo

FS, FF, SS, SF relationships

Schedule passwords

Schedule statistics

Shade non-working days

Eight link geometries

Milestones & benchmarks

Attach external files

Hammock activities

Flexible Licensing Options

NetPoint® with Schedule MD

$3,900*

  • Unlimited installs
  • 1 concurrent user per license

 

Install NetPoint® on as many computers as you’d like. Increase licenses for multi-user concurrency as needed. Very cost effective in team settings!

 

*Initial price includes first year’s maintenance fee of $900.

NetPoint® & NetRisk

$6,400*

  • Includes NetPoint® with Schedule MD™ and NetRisk, a CPM & GPM-based schedule risk analysis module
  • Best value

 

Plan, schedule, and perform risk analysis all in one seamless and intuitive application.

 

*Initial price includes first year’s maintenance fee of $1,400.

NetPoint® in the Cloud

$3,000

  • Access NetPoint anywhere
  • No installation required

 

Deployed via Citrix so you can run NetPoint® from any computer, including Macs and tablets. Accessed through an annual subscription and username/password.

Frequently Asked Questions about NetPoint®

Can this project management software be used for construction scheduling?

NetPoint was created by construction scheduling professionals to optimize project management and team collaboration. NetPoint provides a highly interactive experience in which all stakeholders on the project can be actively engaged and contribute to project planning. During project planning or execution, when task changes occur, NetPoint helps you move activities and adjust durations effortlessly, instantly propagating all changes to the entire network. All objects and data elements update with any schedule modification in real-time. Best of all, NetPoint provides all stakeholders with a deeper insight into the activities with greatest impact to the project schedule and completion.

NetPoint has been used to help ensure success on large construction projects in the following ways: high-level program scheduling, commissioning schedules, owner move-in schedules, issue resolution schedules, master (full-wall scheduling) schedules, sub-consultant coordination schedules, and forensic total float analysis.

Can I create Gantt charts in NetPoint?

Not exactly. Gantt charts are subjective vs. rule-based and thus not reliable tools for construction scheduling. GPM is a logic-based project time visualization that replaces Gantt charts as a project schedule demonstrative. NetPoint’s combined timescale and Logic Diagramming Method (LDM) create a much clearer graphical representation of the schedule than other schedule visualization methods/tools or project management systems.

What is GPM?

The Graphical Path Method™ (GPM®) is an alternative to Critical Path Method (CPM) that promotes rapid, collaborative, and informed project planning. GPM® shows the logical relationships of dated objects – such as activities, subtasks, milestones, and benchmarks – in a time-scaled network diagram with high visual impact. GPM® allows schedules to be created more intuitively and introduces innovative concepts that improve schedule optimization and analysis.

How does NetPoint's collaboration tool lead to the best project outcomes?

NetPoint has been recognized by project management professionals as an outstanding project management tool for real-time project scheduling. NetPoint ensures that upper management can quickly and easily visualize and understand activities on the critical path. Project planning becomes a breeze when project teams can readily focus on critical activities and manage project floats. Schedule changes are updated and tracked in real time, leading to optimal project outcomes.

Integrated Project Scheduling

NetPoint is ideal for Integrated Project Scheduling (IPS) sessions because it helps project stakeholders agree on a plan of action, reach commitment, and align teamwork. This process includes designers, CMs, commissioning agents, and others, who can collaboratively identify milestones in design, construction, and commissioning that can be upheld by the project team. For example, if the design team sets a goal to issue a set of documents by a certain date, but the construction manager needs that information one month prior, the team must agree on an alternate solution. This type of team-wide collaboration allows for greater efficiency and planning for all parties involved and ultimately saves time and money. NetPoint’s intuitive graphical interface and hands-on interaction show the immediate impact and result of every decision.

Does NetPoint integrate with any other scheduling software programs?

NetPoint data is easily exported to Microsoft Excel. Moreover, NetPoint® can be used as a planning tool and then exported to Oracle Primavera P6. Or, a schedule can be imported from P6 to visualize activities graphically and perform dynamic resource leveling. NetPoint is currently available as a SaaS product via Citrix, and we are working on developing a native cloud offering for the future.

Does NetPoint feature document management, time tracking or invoicing?

Since NetPoint is a project planning and scheduling tool rather than a project management information system, it does not offer features like document management, time tracking, or invoicing. Rather, it offers features like critical path calculation, backward planning, resource modeling/leveling, weather modeling, actual vs. planned work management, and variance comparisons, not to mention many features unique to NetPoint, such as the highly visual/interactive interface, real-time calculations, planned dates, and forensic float.

Is NetPoint the right tool for managing time and resources?

NetPoint is an excellent tool for managing time and resources. NetPoint allows you to define any task lists or resources you need to execute your projects. Resource can take the form of human labor, equipment, capital/costs, or material. Cost-loading tasks is done through the resource functionality. Furthermore, by plotting resource histograms and curves directly underneath activities, resource-leveling in NetPoint becomes a truly interactive and engaging exercise.

Does NetPoint produce project reports?

NetPoint’s time-scaled logic diagram is itself an excellent reporting tool, because for once, all stakeholders can understand the schedule. But if other types of data and charts are needed (e.g. resource consumption, variance comparisons, etc.) this type of reporting is achieved primarily by exporting data to Excel, where individual charts and tables can be copied to other destinations, such as word documents and presentations.

Is NetPoint difficult to learn? Is training available?

NetPoint is easy and intuitive to learn and use and can be utilized on a project after watching a demo, reading documentation, or with minimal training. We provide a library of resources online as well as access to scheduling experts to help with your adoption of NetPoint. Our publications include a comprehensive user guide, quick-start demonstrations, and case studies.

Are facilitators available to help my organization with our initial planning sessions?

Facilitators are readily available to help your organization with initial (and ongoing) planning sessions. We also offer extensive training programs. As exclusive providers of GPM® and NetPoint® training programs, we educate all levels of project management practitioners on understanding the fundamentals of GPM®, mastering advanced features of NetPoint®, leading collaborative planning sessions, and more. Seminars typically range from one to three days and include lectures paired with hands-on interaction. Extended NetPoint trial licenses are provided for all attendees during the training period.

PMA Technologies also sponsors an annual conference to showcase new developments of NetPoint and GPM applications, examples and case-studies of how NetPoint and GPM applications are being used in industry, and facilitate interaction amongst users of NetPoint and GPM applications. One of the most popular aspects of these conferences is that subject matter experts from around the world come together present and discuss practical yet cutting-edge solutions to project management challenges.

How can I obtain a free trial?

You can get started for free with our 30-day trial version of NetPoint with videos and comprehensive resources to guide you through the trial period. Click here to start seeing how NetPoint can improve your project results today!