A data date may never be deleted. However, the most current data date may be reset to the project start. This will have the effect of deleting all previous data...
The date of the data date can never be modified graphically by selecting and dragging; it may only be modified using the arrow keys or Gestural Interface. If a significant...
According to CPM, the float of an actualized activity is equal to zero. By default, this activity is now critical, and the bar color will change to red. According to...