Creating Swimlanes from Codes

Once assignments have been made, a code or the WBS can be used to organize a schedule into lanes, with one lane being created for each of the code’s values or WBS nodes. A lane is represented by a horizontal shade extending the entire width of the canvas, and a name (which may or may not be displayed). The height of the lane is determined by the number of activities in the lane and if and how they overlap.

Steps

  1. See [bookmark postid=”11476″ anchor=”steps”]Setting up Swimlanes[/bookmark] in the Automated Layouts chapter.