Main menu

Skip to content
  • NetPoint
  • NetRisk
  • GPM
  • Support
  • Try It
  •  FAQ
  •  User Guide
  •  Tutorials
  •  Publications
  • User Guide/
  • Building a Schedule/
  • Costs and Resources/
  • Deleting an Existing Resource
  • Getting Started
    • Overview
    • About this Text
    • System Requirements
    • Installing/Upgrading NetPoint
    • Configuring NetPoint for Import/Export
    • Working with Projects
      • Importing Your Schedules
      • Opening Projects
      • Saving New Projects
      • Sharing Projects
    • About the Interface
    • Menu Bar
      • File Menu
      • Edit Menu
      • View Menu
      • Schedule Menu
      • Objects Menu
      • Tools Menu
      • Risk Menu
      • Windows Menu
      • Help Menu
    • Toolbar
      • System Icons
      • Object Icons
      • Mode Icons
    • Right-Click Menus
  • Setting up a Schedule
    • Overview
    • Working with PolyTime
    • From a New Document
      • Schedule Properties
      • Page Size
      • Page Tiling & Setup
      • Zoom & Stretch
      • Project Calendars
    • From User-defined Templates
    • From P6, MS Project, or Excel
    • Password-Protection
    • Choosing Between Planning Modes
  • Building a Schedule
    • Overview
    • General Guidelines
    • Planning Tasks
      • Activities
      • Delay/Gain Objects
      • Annotating Activities, Delays, & Hammocks
      • Splitting Activities
      • Dissolving Activities and Delays
      • Hammocks
    • Planning Key Events
      • Milestones
      • Annotating Milestones
      • Benchmarks
      • Annotating Benchmarks
    • Logic & Relationships
      • Creating FS Links
      • Using Embeds to Create SS and FF Links
      • Optimizing Link Geometries
      • Enforcing Link Offsets
      • Annotating Links
      • Highlighting Link Chains
      • Treating Redundancies
      • Overriding Logic
    • Non-Planning Objects
      • Shades
      • Annotating Shades
      • Other Drawing Tools
      • Text Boxes and Note Fields
      • Info Objects
      • Image Files
    • Project Codes
    • Costs and Resources
      • Defining Resources
      • Modifying an Existing Resource
      • Deleting an Existing Resource
      • Assigning Resources to Activities
      • Viewing the Resource Profile
      • Limiting Resource Consumption
      • Noting Changes in Consumption
  • Optimizing a Schedule
    • Overview
    • Minimizing Clashing
    • Global Edit Mode (GEM)
    • Paste Format
    • Gestural Interface
    • Moving Blocks of Activities
    • Setting Constraints
    • Searching for Objects
    • Setting Properties for Multiple Selected Objects
    • Schedule Statistics
    • Viewing Predecessors and Successors
  • NetRisk™ Risk Analysis
    • Overview
    • Getting Started with NetRisk™
      • Known Issues and System Requirements
      • Introduction to Stochastic Scheduling
    • The NetRisk™ Manager
      • Sorting, Adding, and Removing Columns
      • Filtering Lists
    • Duration-Ranging, Floating, and Pacing
      • Using a Global Distribution
      • Ranging Activity-by-Activity
      • Handling Constraints, Dates, and Progress
      • Correlating Activity Durations
      • Using Delays to Model Existence Risks
    • Qualitative Analysis
      • Defining Probabilities and Impacts
      • Configuring the Risk Breakdown Structure
      • Choosing Risk Impacts at the RBS Level
      • Adding Risks to the Risk Register
    • Quantitative Analysis
      • Choosing Risks for Simulation
      • Assigning Risks to Activities
      • Correlating Likelihoods Through Assignment Groups
      • Correlating Risk-Activity Pairs
    • Simulating the Schedule
      • Running a Risk-Light Simulation
      • Running a Detailed Simulation
      • Stopping, Starting, and Saving a Simulation
    • Results and Reporting
      • Previewing Results in the Manager
      • Enlarging, Customizing, & Printing the Charts
      • Comparing Simulations
      • Viewing Results on the Canvas
      • Exporting Charts, Tables, and Data to Excel
    • Glossary
    • Appendix
      • A: Distribution Shapes and How to Choose Them
      • B: Choosing Between Monte Carlo and Latin Hypercube
      • C: The Difference Between Pearson and Spearman Rank Order
      • D: Comparison of Charts Between NetRisk and OPRA
      • E: Choosing a Custom Color
  • Updating a Schedule
    • Overview
    • Data Dates
    • Targets
    • Statusing Objects
    • Actualizing Objects
    • Displaying Durations for In-progress Activities
    • Floats and Drifts for Actualized Objects
  • Inputs and Outputs
    • Overview
    • Primavera P6 & Deltek Open Plan
      • Preparing to Import from P6
      • Importing from P6 & Open Plan
      • Exporting to P6 & Open Plan
    • Microsoft Project
      • Exporting (Only)
    • Microsoft Excel
      • Importing from Templates
      • Importing Generic Spreadsheets
      • Exporting Raw Schedule Data
      • Using Excel to Update NetPoint
      • Generating Object, Target, & Pred/Suc Reports
    • Native XML/Synchro
    • Printing and Presenting
    • Capturing Snapshots
  • Troubleshooting
    • Overview
    • Understanding File Recovery
      • Recovering New or Unsaved Projects
      • Recovering Existing Projects
    • Version Compatibility
    • Constraint Violations Due to Calendar Change
 Download User Guide (PDF) Back to top

User Guide navigation

  • ← Modifying an Existing Resource
  • Assigning Resources to Activities →

Deleting an Existing Resource


Tags

resources

Last Updated

May 27, 2013

Related Resources
  •  Modifying an Existing Reso...
  •  Defining Resources
  •  How do I read the resource...

To delete any resource, open the Project Resources window, select a resource from the list of Project Resources, and click the Delete button. Click the Exit icon to close the Project Resources window.


User Guide navigation

  • ← Modifying an Existing Resource
  • Assigning Resources to Activities →

 News

  • Apr 3, 2013 PMA Consultants Expands Commitment to the UMCIAP...
  • Jan 29, 2013 PMA Completes Third Annual NetPoint User Conference...
  • Jan 25, 2013 PMA Technologies Debuts NetRisk™ at Third Annual NetPoint® User Conference...
  • Aug 13, 2012 PMA Technologies Announces NetPoint® 4.1 Release...
  • Jun 25, 2012 PMA Technologies Receives Patent for the Graphical Path Method™ (GPM®)...
All
  •   
  •   
  •   
  •   
  • Contact Us
  • About
  • Services
  • Download
  •  Shop
  • Publications
  • User Conference

© 2013 PMA Technologies. Legal Info.